Upgrade Primavera while preserving your data
Backup, connection to the existing database, result control and return route.
Study training.
From software upgrade guidance to designing reliable processes.
Backup, connection to the existing database, result control and return route.
Study training.Project360 team tools and compatibility conditions.
Viewing the tools.Explore the control logic: select a stage and see how a hold at a critical point affects the process.
The route is displayed in normal mode.
When the basis, the date of the situation and the measurement rule are not the same, the progress scores are not comparable.
WBS, approved program, status date and evidence of progress are connected to a common structure.
Any deviation must be ⁇ in relation to the clear basis, with reason, responsible for action and the date of follow-up.