Practical knowledge for better project control

From software upgrade guidance to designing reliable processes.

Upgrade Primavera while preserving your data

Backup, connection to the existing database, result control and return route.

Study training.

Free Persian add-on for P6 25.12

Project360 team tools and compatibility conditions.

Viewing the tools.
PROJECT360 / CONTROL IN MOTION

Follow the pathway from bottleneck to decision

Explore the control logic: select a stage and see how a hold at a critical point affects the process.

The route is displayed in normal mode.

Actual bottleneck

When the basis, the date of the situation and the measurement rule are not the same, the progress scores are not comparable.

Project 360 Controls

WBS, approved program, status date and evidence of progress are connected to a common structure.

Verifiable evidence

Any deviation must be ⁇ in relation to the clear basis, with reason, responsible for action and the date of follow-up.