Project360
Menu
English
Knowledge and practical tools

Build on practical experience.
Move forward with confidence.

Practical files and tools for project planning, control and reporting, available to Project360 members.

Browse files Member downloads
Your resource library

Files & tools

0 file published.

Planning and scheduling

Templates and tools for schedule development and monitoring

Control and reporting

Analytical files and project report templates

Tools and extensions

Tools to simplify repetitive work.

EXEPROJECT360
EXE
Primavera P625.12

Free Persian Gantt for Primavera P6 25.12

Free Project360 Windows tool for Persian dates in the Primavera P6 Professional 25.12 Gantt chart. Compatible with version 25.12 only.

File password: project360

37 MB2 ↓
Product details and guideSign in or register to download ↗

Join to receive the files.

Once registered, the published files will be available for you.

Register or sign in
PROJECT360 / CONTROL IN MOTION

Follow the pathway from bottleneck to decision

Explore the control logic: select a stage and see how a hold at a critical point affects the process.

The route is displayed in normal mode.

Actual bottleneck

An XER file alone does not demonstrate that all database data and settings can be recovered.

Project 360 Controls

Identify the database type and supported upgrade path, then create a full backup and test the recovery procedure.

Verifiable evidence

Before the production migration, reconcile projects, baselines, calendars, resources, relationships and settings against the restored copy.

در حال آماده‌سازی کتابخانه فایل‌ها…لطفاً چند لحظه صبر کنید.