Project360
Menu
English
Process engineering / testable control

Every decision,
A reliable way.

Recording information is not enough. It must be clear who may release the next stage, using which revision and on what evidence. Explore six examples of the control logic we design for your organization.

PROJECT360 / PROCESS ATLASThe concept, not the customer.
← Control → Control → Control

A valid decision is made from the connection of both three.

Version-controlled evidencePermited RoleThe trace of change.
Six operational routes.

Start with your own bottleneck.

Each page includes process definitions, interactive labs, roles, passing conditions, exceptions, indicators and admission tests. These models are the starting point of analysis; the final circulation is extracted from the contract and the structure of your organization.

Three Concepts

It is confirmed with
“Confirmed” is different.

01 – Registration

Reality or request.

Data, source and time of receipt are registered. event registration is still not permitted to execute, cost or use of the certificate.

02 - The Certification

The case is decisive.

Completeness, compatibility of the copies and evidence are controlled. the revisor may accept the full file but has no authority to approve it.

03 Decision

The authorization is permitted.

Results, conditions and evidence of the decision are recorded. Only the same decision can create the license of the next step or change the approved basis.

FROM MODEL TO YOUR SYSTEM

Your workflows extend beyond these six models.

Resource systems, correspondence, assets, services and other organizational processes are also after analysis designable. introduce a specific issue and the expected output.

Your Requirements
PROJECT360 / CONTROL IN MOTION

Follow the pathway from bottleneck to decision

Explore the control logic: select a stage and see how a hold at a critical point affects the process.

The route is displayed in normal mode.

Actual bottleneck

Workflow without a clear responsibility boosts decisions between several organizations.

Project 360 Controls

For each commitment, the proposer, the examiner, the approvaler and the reference path are specified.

Verifiable evidence

The form of the meeting and the decision must be in the contractual authority, the deadline of response and responsible for the implementation of the result connected.